The artificial rock will be used throughout the grotto and slide area.
The shotcrete is extended across one of the river’s loops to strengthen the structure.
Early stage of the lazy river.
The palm trees were set in place early in the process, when access was more clear.
Floating stainless steel stairs leading into a lower catch basin.
The main pool is seen from another angle.
The pool that will house the FlowRider surf simulator.
Shoring and forming for the bridge between the river and surf simulator intake.
An intricate shoring system is used to support forms for the grotto deck.